1. Framing: Constructing the framework for the partition, which may involve metal or wooden studs.
2. Drywall or Panel Installation: Attaching drywall sheets, panels, or other partition materials to the frame.
3. Electrical Work: Running electrical wiring and outlets within the partition, if applicable.
4. Painting or Finishing: Applying paint, wallpaper, or other finishing materials to the partition surface.
5. Doors and Hardware: Installing doors, handles, locks, and any necessary hardware for functional partitions.
6. Glass or Window Installation: If the partition includes glass components or windows, this would be part of the work in progress.